This question was closed without grading. Reason: No acceptable answer
Dec 4, 2018 20:50
5 yrs ago
English term

to shell conditions

English to French Tech/Engineering Electronics / Elect Eng Installation électrique dans un restaurant
Provide a 200 amp, and 347/600 volt electrical feed thru a 24 circuit panel equipped with a main breaker switch (Siemens, Cutler-Hamer or Square-D), including a 112.5kva transformer suspended to the structure of the Leased premises feeding a 200 amp 120/208 volt, 3 phase, 4 wire service terminated in an 84 circuit blank panel a splitter and a 30 amp disconnect and connection to HVAC unit(s), terminated at a location in Leased premises stipulated by the Tenant. Landlord will install emergency exit lighting at all exit doors to shell condition, per local code. Tenant is responsible for installation of any ancillary exit lighting required to suit Tenant's interior fixturing, per local code
Proposed translations (French)
4 +1 à la fin du gros oeuvre
4 -1 (allant) jusqu'au gros oeuvre /incluant le cahier des charges du gros oeuvre

Discussion

Daryo Dec 11, 2018:
yes, it's the "condition" of the whole rented unit - it's just "a shell", basically bare walls.
Tony M Dec 4, 2018:
@ Asker Note there is an error in your question text: it is 'condition' (singular), not 'conditions' as you have put.

Proposed translations

+1
10 hrs

à la fin du gros oeuvre

"Shell Only Assessment
This assessment and certification option is available where the developer’s scope of works covers new build works to the fabric, sub and superstructure of the building only, including:
External walls, windows, doors (external), roof, core internal walls, structural floors
Hard and soft landscaping areas (where present and within scope of works)"
https://www.breeam.com/BREEAMUK2014SchemeDocument/content/14...

"Les travaux de gros œuvre
Les travaux de gros œuvre comprennent les fondations, le soubassement, l'assainissement, l’élévation des murs, la toiture, la charpente, et parfois les menuiseries extérieures.
Les fondations constituent le premier type de gros œuvre sur un chantier de construction de maison neuve. "
https://www.consortium-immobilier.fr/guide/achat-vente/4/22/

Peer comment(s):

neutral Tony M : I think here they're talking about the shop unit etc. being rented out as an 'empty shell' — but this doesn't necessarily mean at the original buildign stage; it could be a subsequent let.
52 mins
agree B D Finch : Re Tony's comment above, I disagree and think this has to be for an initial let after construction works. It is essential to correct the header term to "condition", not "conditions".
9 hrs
Something went wrong...
-1
2 days 47 mins

(allant) jusqu'au gros oeuvre /incluant le cahier des charges du gros oeuvre

Conditions: cahier des charges, "shell" le gros oeuvre
Peer comment(s):

disagree Tony M : 'conditions' does not mean 'cahier des charges' in this context, where 'condition = state; and 'shell' only = 'gros œuvre' in certain specific context (i.e., generally, when building a new construction; this doesn't appear to be the context here (letting)