- Sep 22 '21 esl>eng capacidad de corte breaking capacity pro closed no
4 Jul 28 '20 eng>esl rattling from within the unit traqueteo proveniente del interior del equipo pro closed ok
4 Jun 23 '20 eng>esl Building load test desarrollo de pruebas de carga (eléctrica) pro closed ok
4 Mar 23 '20 esl>eng disparo de la SET a device at the substation tripped pro closed no
- Feb 21 '20 eng>esl draws test passed pasa la prueba de consumo de corriente pro closed no
4 Mar 2 '19 esl>eng pluma de derrame spill plume pro closed ok
- Aug 29 '18 esl>eng bloque de válvulas set of valves (or) pro closed no
- Aug 14 '18 eng>esl Coil former carrete de bobina pro closed no
- Jul 30 '18 eng>esl Protectively earthed debidamente aterrizadas pro closed ok
- Jun 12 '18 esl>eng posición de desbloqueo unlocking position pro closed ok
- Feb 3 '18 esl>eng torres de deflexión y remate baffle and tie-in towers pro closed ok
- Nov 29 '17 esl>eng Técnico de Compras Purchasing/Procurement Clerk pro closed ok
- Oct 11 '17 esl>eng Icc máxima soportada maximum rated Isc pro closed ok
- Sep 3 '17 esl>eng esquemas desarrollados schematics prepared pro closed no
4 Jul 23 '17 eng>esl trips of the system disparos del sistema pro closed ok
4 Jul 1 '17 esl>eng factor de liquidación payment factor pro closed no
4 Jul 1 '17 esl>eng Equipo de medida Técnica technical measuring device/instrument pro closed no
4 Jun 25 '17 esl>eng Equipo Patrón standard instrument pro closed no
4 Apr 1 '17 eng>esl power performance (measurement) eficiencia energética pro closed ok
- Mar 20 '17 eng>esl landing bar see explanation below pro closed no
- Apr 24 '15 esl>eng senda de implantación roadmap for implementation pro closed ok
- Mar 24 '15 esl>eng seguimiento horario de la demanda keeping track of demand on an hourly basis pro closed no
4 Feb 17 '15 eng>esl liner tubo de revestimiento pro closed no
- Jan 21 '15 esl>eng el Escenario de prospectiva forward-looking scenario pro closed ok
- Jun 30 '14 eng>esl silver-plated copper buss blade cuchilla de barra de cobre plateado pro closed no
- Apr 9 '13 esl>eng Esquema eléctrico unifilar single-line electrical diagram pro closed ok
- Aug 18 '12 eng>esl automatic switch for the sectioning disyuntor automático para el corte pro closed ok
- Jul 20 '12 eng>esl Motor operated sliding type series disconnector disyuntor deslizante en serie accionado por motor pro closed ok
- Jul 19 '12 eng>esl 2-phase to earth fault current corriente de falla bifásica a tierra pro closed ok
4 Jul 18 '12 eng>esl I&C cabinet armario de instrumentación y control pro closed ok
4 Jul 6 '12 esl>eng programación to schedule pro closed no
- Jan 13 '12 esl>eng eje de grupo shaft to the assembly pro just_closed no
4 Dec 12 '11 esl>eng operating or operational operating power pro closed ok
4 Nov 12 '11 esl>eng alteraciones puntuales specific or one-time disturbances pro closed ok
- Nov 3 '11 esl>eng puesta en presión rápida (PPR) rapid pressurization/pressurisation coil pro closed no
- Jul 29 '11 eng>esl interrupting protective device disyuntores de protección pro closed ok
- Jul 14 '11 esl>eng Nivel máximo correspondiente a la CMP maximum level equal to the MPF pro closed ok
- Jul 12 '11 esl>eng disparo trip (see full version below) pro closed ok
- May 26 '11 esl>eng trabajar en caliente to work with live lines or with a live system pro just_closed no
4 Mar 31 '11 esl>eng Primer mantenido indemne XX shall be held harmless.. pro closed ok
- Dec 7 '10 esl>eng potencia unitaria en inversores of 99 kW each available from inverters.... pro open no
4 Sep 4 '10 esl>eng unidad térmica de punta state-of-the-art thermal power plant pro closed ok
4 Jul 28 '10 eng>esl one-piece-flow production (OPF) producción de flujo continuo pieza a pieza pro closed ok
4 Jun 15 '10 esl>eng en horario punta at peak hours pro closed ok
- May 27 '10 esl>eng reductor step-down transformer pro open no
- Feb 18 '10 esl>eng S/C sin corriente pro just_closed no
- Feb 18 '10 esl>eng neutro ficticio virtual neutral pro just_closed no
4 Feb 3 '10 esl>eng tramos de barras busbar sections pro closed ok
4 Feb 2 '10 esl>eng tensiones nominales de alimentación rated supply voltages pro closed ok
- Feb 2 '10 esl>eng corte de arco (electric) arc suppression pro closed ok